Bathroom renovation cost in Singapore: HDB prices, scope and timeline

SparkFlow's HDB bathroom guide prices start at $6,000 for a common bathroom, $8,000 for a master and $13,000 for both. The useful comparison is the written scope behind each number.

SparkFlow team7 min read

Bathroom renovation prices are easy to advertise and surprisingly hard to compare. One quote may include floor and wall hacking, regulated plumbing, a documented wet-area system and new fixtures. Another may be an overlay with owner-supplied fittings. The totals can look close while the work is completely different.

As at 31 July 2026, SparkFlow's first-party guide prices start at $6,000 for a common HDB bathroom, $8,000 for a master bathroom and $13,000 for both bathrooms. Those are SparkFlow starting prices, not a claim about the Singapore market. A site survey, current HDB conditions and the signed line-itemed quote decide the actual price.

SparkFlow bathroom renovation prices and timelines

SparkFlow guide prices as at 31 July 2026
Bathroom scopeGuide priceIndicative duration
Common bathroomFrom $6,0008–12 days
Master bathroomFrom $8,00010–14 days
Both bathroomsFrom $13,00012–18 days

The durations are planning ranges, not guaranteed completion dates. Ask whether the clock starts at permit approval, site possession or the first day of hacking. Off-site procurement may happen earlier, while curing, inspection and countertop or screen fabrication may sit on the critical path.

What moves the bathroom renovation quote?

Bathroom area matters, but the work behind the finishes usually matters more. Give every contractor the same proposed plan and fixture schedule, then compare these variables.

Bathroom quote variables to compare line by line
VariableWhat the quote should make clear
Removal and accessRetain, overlay or hack; protection, haulage, disposal and lift or stair access.
Existing conditionAllowance for loose screed, corroded pipes, leakage, damaged substrate or unsafe wiring discovered after opening up.
LayoutWhether the toilet, basin, shower, floor trap, heater and door remain in place or need an approved relocation.
Wet-area systemSpecified products, preparation, junction details, curing, test or inspection, protection and records.
Tiles and finishesSupply allowance, tile size, wall height, pattern, trims, niches, grout and compatible sealant.
Fixtures and servicesBrands or allowances, delivery, installation, regulated plumbing, electrical work, testing and making good.

A low quote can be perfectly valid for a light scope. The problem is an undefined scope: "full bathroom" does not tell you which walls are tiled, who supplies the sanitary fittings, whether regulated trade work is included, or what happens if the substrate is unsound.

HDB approval comes before wet-area work

HDB's renovation-permit guidance says owners should engage a contractor listed in the Directory of Renovation Contractors (DRC), and that the renovation contractor submits the application. Certain work may also need a Qualified Person. The room name alone does not answer the permit question; the exact hacking, finishes, layout and service changes do.

HDB's current contractor terms require prior approval for permit-controlled work and specify pre-packed material or waterproof screed in wet areas. Flat-specific restrictions and permit conditions can add detail, especially where original floor or wall finishes are involved. Read the approved permit instead of relying on a verbal "HDB can".

For a broader work-by-work checklist, use our HDB renovation permit guide.

What a useful wet-area method statement looks like

Waterproofing is a system, not a boast about a fixed layer count, a success percentage or a fixed number of leak-free years. The useful document is the project-specific method statement tied to the approved scope and the selected product data. It should cover:

  1. Existing condition and limits: what is removed, retained and protected, plus any defect that must be resolved first.
  2. Substrate preparation: cleaning, repairs, level, moisture condition and the base required by the specified system.
  3. Critical details: wall-to-floor junctions, corners, pipe penetrations, kerbs, floor traps and any upturns in the approved detail.
  4. Application: exact primer, membrane or screed product, stated coverage or coat requirement and manufacturer cure intervals.
  5. Inspection and test: who checks the work, what water test or other verification is agreed and whether site or building conditions allow it.
  6. Protection and finishes: how later screed, falls, adhesive, tiles, grout and fixtures avoid damaging the completed system.
  7. Handover evidence: dated photos before concealment, product details, test record, defects process and written warranty terms.

The manufacturer's specification controls the number of coats, thickness, coverage and curing. More advertised "layers" do not rescue poor preparation or incompatible products, and no responsible contractor can promise that a wet area is incapable of leaking.

The regulated trades are separate from the main contractor

A DRC listing lets the renovation contractor handle the HDB renovation scope and submission; it is not every trade licence rolled into one. PUB's plumbing-work guidance says regulated water-service and sanitary plumbing work must be done by a PUB Licensed Plumber. It also distinguishes a limited set of simple plumbing jobs that a handyman may perform.

HDB's permit page separately directs owners to an EMA-licensed electrical worker for electrical work. A bathroom proposal should name who assesses heater loading, fixed wiring, switches, sockets, bonding or protective devices for the actual layout. A company registration or general renovation credential does not replace the responsible worker's licence.

How the 8–18 day sequence is normally built

A project programme should be based on dependencies rather than forcing every bathroom into the same day-by-day script. The usual order is:

  • protect common areas, isolate relevant services and complete only the approved removal;
  • inspect the exposed condition and agree any genuine variation before extra work;
  • complete plumbing and electrical first-fix with the responsible licensed trades;
  • prepare the substrate and install the specified wet-area system, including required cure and verification time;
  • form falls and finish floors and walls without damaging concealed work;
  • install sanitary fittings, heater, lights, accessories, screen or vanity in the agreed sequence;
  • test services, complete sealants and touch-ups, clean, inspect and close the snag list.

Doing both bathrooms in parallel can share labour and deliveries, but it can also leave the home without a usable bathroom. Agree whether work is staggered, which toilet or shower remains available, and the exact safe access rules. If the flat is occupied, temporary washing arrangements are a planning requirement, not an afterthought.

What to have ready before asking for a quote

  • Flat type, bathroom location and clear photos of every wall, floor and ceiling.
  • The current layout and every fixture you want to retain, replace or relocate.
  • Known leaks, hollow tiles, recurring mould, poor drainage or electrical concerns.
  • Tile and fixture preferences, with model dimensions where already selected.
  • Whether the home will be occupied and whether another bathroom must stay usable.
  • Your target dates, building access limits and any flat-specific HDB renovation documents.

For a scope-led proposal, send that information through SparkFlow's bathroom renovation service. We can then separate the base scope, selections, regulated trades, provisional items and genuine site unknowns before you compare the total. If an existing bathroom is damp rather than due for a rebuild, start by checking the ventilation questions in our bathroom exhaust fan guide instead of assuming renovation is the first answer.

Frequently asked questions

How much does an HDB bathroom renovation cost in Singapore?
As at 31 July 2026, SparkFlow's guide prices start at $6,000 for a common bathroom, $8,000 for a master bathroom and $13,000 for both bathrooms. These are first-party starting prices, not market averages; the site condition, selections and written scope determine the final quote.
How long does an HDB bathroom renovation take?
SparkFlow's indicative durations are 8–12 days for a common bathroom, 10–14 days for a master bathroom and 12–18 days for both in parallel. Permit timing, material availability, curing, the selected wet-area system, hidden conditions and approved variations can extend the programme.
Do I need an HDB permit to renovate a bathroom?
Some bathroom work requires HDB approval, while other work remains subject to HDB conditions. A contractor listed in HDB's Directory of Renovation Contractors should classify and submit the exact scope. Do not start floor, wall or layout work until the required permit and conditions are confirmed.
What should a bathroom waterproofing method statement include?
It should identify the approved scope, substrate preparation, exact product system, junction and penetration details, stated coverage or coat requirements, cure times, protection, screed and falls, inspection or test method, photo records and warranty terms. The manufacturer's data and approved detail matter more than a generic layer count.
Who handles plumbing and electrical work in an HDB bathroom?
The DRC-listed renovation contractor coordinates the project, but separate trade rules still apply. PUB requires a Licensed Plumber for regulated water-service and sanitary plumbing work, and HDB directs owners to engage an EMA-licensed electrical worker for electrical work. Ask the quote to name each responsible trade.