Renovation

HDB renovation permits: what needs approval and how the process works

Your contractor normally submits the permit, but the flat owner remains responsible. Use this checklist to verify the scope, people, notices and working hours before anyone starts.

SparkFlow team6 min read

An HDB renovation permit is not just a form your contractor files in the background. It records approved work at your flat, names the contractor, and sets conditions for how that work is carried out. The contractor usually submits it, but HDB says the flat owner remains responsible for making sure the renovation follows the rules.

The safest approach is to treat “permit needed?” as a work-by-work question. Wall hacking, floor finishes, bathrooms, windows, electrical loading and air-conditioning do not all follow one rule, and a verbal “HDB approved” is not evidence.

Start with the exact scope, not the room name

“Kitchen renovation” is too broad for a permit check. The scope may include cabinet replacement, wall demolition, floor hacking, a relocated sink, gas work, new power points and an aircon change. Each item can sit under a different HDB guideline or regulated trade.

HDB's renovation hub links to the current building, window, electrical, air-conditioner, water, sanitary-plumbing and gas guidelines. Use those work-type pages rather than an old renovation checklist or a social-media answer.

Questions to answer for each renovation item
QuestionWhy it matters
What is being removed, added or relocated?“Replace” and “relocate” can have different conditions.
Does it affect a wall, slab, wet area or external elevation?Structural, waterproofing and façade controls may apply.
Is fixed electrical, gas or water-service work involved?The responsible licensed worker may be separate from the main contractor.
Does the flat type or age add a restriction?Loading, original finishes and building systems vary.
What does the permit or guideline expressly allow?The written condition—not the sales pitch—governs the work.

Who is allowed to submit and carry out the renovation?

Under HDB's homeowner renovation guidance, flat owners must engage a contractor listed in the Directory of Renovation Contractors (DRC). HDB also states that contractors must be listed before carrying out renovation in an HDB flat.

Check the legal company name and registration in the directory, then make sure that same contractor is named on the permit and actually controls the work. The registered contractor should not lend its number to an unregistered company.

A DRC listing is not a universal trade licence. HDB's permit application page separately tells homeowners to engage:

  • an EMA Licensed Electrical Worker for electrical work;
  • a BCA-trained air-conditioner installer for aircon installation;
  • a Qualified Person for renovation scopes that require professional certification or supervision; and
  • the specifically approved or licensed contractor required by the window, gas, water or sanitary-work guideline.

How the permit process normally works

1. Freeze a detailed scope

List the proposed work by location and type. Include removals, new construction, floor and wall finishes, fixture relocations, service routes and major equipment. If the plan changes later, ask whether the permit or supporting drawing must be amended before the changed work.

2. Verify the contractor and supporting professionals

Confirm the DRC entry and collect the details of any LEW, Qualified Person, trained installer or other regulated worker needed. Company registrations such as BCA ME05 L1 do not replace an individual electrical worker's EMA licence.

3. Prepare the documents

The registered contractor submits the application electronically on the owner's behalf. HDB says an open utilities account is required before submission. For work such as wall demolition, the contractor may need the flat floor plan marked with the proposal. A Qualified Person may need to prepare or endorse other material for certain scopes.

4. Read the approved permit

Check the address, contractor, approved work and conditions. Do not let work start merely because an application was submitted. Prior approval is required for permit-controlled work, and wall hacking requires HDB's written approval and certified demolition workers.

5. Notify neighbours and display the notice

HDB's current contractor terms and conditions require notices to nearby flats and the HDB Notice of Renovation to be displayed near the unit during the work. The current terms specify at least five days' notice to flats within the stated radius, even when the work itself does not require a permit.

HDB renovation working hours

The current HDB contractor terms distinguish noisy work from other renovation work:

  • Noisy work: 9am to 5pm, Monday to Friday only. This includes wall demolition, removal of floor or wall finishes, tile cutting, and heavy or excessive drilling. It is not allowed on Saturdays, Sundays, public holidays or specified major-holiday eves.
  • Other renovation work: 9am to 6pm on weekdays and Saturdays. No renovation is allowed on Sundays or public holidays.
  • HDB's terms also say the listed noisy work must be completed within three consecutive days.

The permit may contain additional project-specific conditions. Your contractor should plan deliveries, cutting and drilling around those limits rather than apologising to neighbours after the fact.

A permit is not a blank cheque

Approval does not allow a crew to alter structural members, depart from the submitted drawing or ignore product instructions. It also does not guarantee workmanship, price, timing or the quality of your contract. Keep an itemised quotation, drawings, variation approvals, product data, photos before concealment, test records and the final snag list.

For a resale project, align the permit path with the renovation timeline. For a new flat, finish the handover and defect checks before irreversible work hides the original condition.

What changes for a condo or landed home?

An HDB renovation permit does not apply to private property, but that does not mean “no approval.” A condo's MCST or managing agent can require drawings, deposits, contractor insurance, work-hour rules and lift protection. Structural, fire-safety, electrical, gas, water-service and planning requirements still apply according to the scope. Obtain the building's current renovation pack before quoting the programme.

Your pre-start checklist

  • Itemised scope and marked-up plan are final.
  • The contractor appears in HDB's DRC under the correct company name.
  • The permit is approved and matches the work.
  • Every separately regulated trade has a named responsible person.
  • Neighbour notices and the site notice are ready.
  • Noisy work is programmed within HDB's weekday window.
  • Variations require written approval before execution.
  • Photos, tests, product details and handover documents are part of the contract.

SparkFlow is an HDB Registered Renovation Contractor (HB-10-5499Z). For a permit-led scope, send your floor plan and itemised wish list through our renovation service. We will flag the approval and regulated-trade questions that need to be resolved before the programme is promised.

Frequently asked questions

Who applies for an HDB renovation permit?
An HDB Registered Renovation Contractor normally submits the application electronically on the flat owner's behalf after being authorised. The owner should still verify the submitted scope, permit conditions and contractor listing because HDB says the flat owner remains responsible for renovation compliance.
Does every HDB renovation need a permit?
No. HDB classifies some work as permit-required, some as allowed subject to conditions, and some as disallowed. The answer depends on the exact work and flat. Check the current work-type guideline and have the registered contractor confirm the classification in writing before starting.
Can renovation hacking be done on Saturday?
No. HDB's current contractor terms allow noisy work such as wall demolition, removal of floor or wall finishes, tile cutting and heavy drilling only from 9am to 5pm, Monday to Friday. It is not allowed on weekends, public holidays or specified major-holiday eves.
Does an HDB renovation permit cover electrical and aircon work?
Not by itself. HDB tells homeowners to engage an EMA Licensed Electrical Worker for electrical work and a BCA-trained air-conditioner installer for aircon installation. Window, gas, plumbing and structural scopes can also have separate contractor, professional or authority requirements.
Can I use any interior designer or contractor for an HDB renovation?
The company carrying out HDB flat renovation must be listed in HDB's Directory of Renovation Contractors. An interior designer may coordinate the project, but verify the actual registered contractor named on the permit and do not allow another firm to borrow that registration number.